Project: Ahwaz Sewer Pipe Line Project
Employer: Ahvaz' water and wastewater company
Contract: PC
Start and finish date: 2011-8-13 until 2013-2-10
:Discipline
:Main Items Of Work
circular reinforced concrete
piping of 1200 mm diameter
circular reinforced concrete
piping of 800 mm diameter

Project: Complete rehabilitation and revamping of IrankhodroSaze Company (Peikanshahr)
Employer: Irankhodrosazeh Company
Contract: PC
Start and finish date: 2008-4-20 until 2008-7-20
Discipline
Highlights
Complete rehabilitation and revamping of a 4 story building to transform an old residential building to office. Including the complete removal of partition and loading bearing walls to create a completely open office area, including of mechanical and electrical rooms of facility together with complete smoke/fire
.detection system
Items of works

Project: Double Span Bridge Construction in Tehran- Shomal Highway
Employer: Tehran-Shomal highway company
Contract: PC
Start and finish date: 2007-5-27 until 2008-11-27
Discipline:
Highlights:
The Bridge consisted of plate girder on each side, 100,000 kg girders. The bridge was constructed using strand jacks. The jacks were arranged in a "pull-push" configuration enabling accurate and thorough control throughout the installation of the main elements (girders).
|
Items of works: |
|
|
Earth works |
45,000 m3 |
|
Earth fill works |
250,000m3 |
|
Reinforcement |
450,000 kg |
|
Concreting |
4,000m3 |
|
Steel structures |
1,000,000 kg |
\
Project: Comprehensive outsourcing of Ghods water and sewer operations and maintenance
Employer: Tehran west’s water and wastewater company
contract: PC
Start and finish date: 2013-5-12 until 2014-11-12
Discipline:
Highlights:

Project: Shiraz 3000m3potable water reservoir-double concentric concrete cylinders
Employer: Water and wastewater organization of Shiraz
Contract: PC
Start and finish date: 2012-6-25 until 2013-6-25
Discipline:
Highlights:
Ancillary works including valve chamber, gantry crane structure, complete chlorination system with control panel, etc.
|
Items of work: |
|
|
Heavy soil and rock cutting |
11800 m3 |
|
Reinforcement |
1200000kg |
|
Concreting |
1250 m3 |
|
Shuttering |
3,400 m2 |

Project:
Outsourcing of Maintenance and repair of Bushehr Port complex
Employer:
Bushehr ports and maritime organization
Contract:
PC
Start and finish date:
2010-7-20 until 2011-7-20
Discipline:
• Civil
• Mechanical
• Electrical
Highlights:
Complete rehabilitation of electrical. /mechanical, Communicational and building systems Construction of 5 fully furnished guest houses for the Bushehr Ports and marine organization All the lighting and energy conservation units were integrated within the IBM systems. Fully furnished marine control room for operation control, surveillance and guidance.
Items of works:
• Reinforcement 42,107kg
• Steel works 265,110 kg
• Concrete 3,250 m3
• Pipe laying in various sizes 30,220 m • Shuttering 5,790 m2

Project:
The completion of Azadi stadium subway station Employer: Tehran and suburb's subway station
Contract:
PC
Start and finish date:
2007-7-23 until 2008-4-23
Discipline:
• Civil
• Mechanical
• Electrical
Highlights:
• Various control rooms for the operations, lightings, switching, boards, train operations, escalators, etc.
Items of works:
• Concreting 3,200 m3
• Shuttering 14,000m2
• Finishing works 7,800 m2
• Pavement 21,500 m2

Project:
Hashtgerd Islamic Azad University main building
Employer:
Hashtgerd Islamic Azad University
Contract:
PC
Start and finish date:
2009-11-7 until 2010-12-17
Discipline:
• Civil
• Mechanical
• Electrical
Highlights:
• Water cooled air conditioning for 7000 m2 of area in 4 floors Installation of complete electrical and mechanical systems for the whole building, supporting the lighting, the air conditioning, the data center, etc. The building included central computer room, Fire detection system together with the accessories for IBM( Intelligent Building Management Systems).
Items of works:
• Reinforcement 170,000 kg
• Steel Structure 560,000 kg
• Concrete 2300 m3
•Stone and tile works 11,800m2
• Brick walls and Partitions 5,500m2
• Central computer room 6o m2

Project:
Bushehr Islamic Azad University, Department of Humanitie and Behavioral Science Employer
Contract:
PC
Start and finish date:
2010/3/2 until 2011/7/2
Discipline:
• Civil
• Mechanical
• Electrical
Highlights
• Central air conditioning consisting of chillers, evaporators and condensers etc. for a 4 floors building of 4000 m2 constructed area.
Main Items Of Work:
• Reinforcement 105,000 kg
• Steel structure 300,000 kg
• Concrete works 1580 m3
• Facade and other 5,800 Stone works
• Brick wails and Partitions 6
• False ceiling 9=2
![]() |