Ahwaz Sewer Pipe Line Project

c82cc4e14a1d2c8c8ffff9840d24b558 L

 

 

 

Project: Ahwaz Sewer Pipe Line Project

Employer: Ahvaz' water and wastewater company

Contract: PC

 

Start and finish date:   2011-8-13 until 2013-2-10

 

 

:Discipline

Civil
 

:Main Items Of Work

•   Pipe laying with circular reinforced concrete               1,130 m

     circular reinforced concrete

     piping of 1200 mm diameter

•   Pipe laying with                                                       575 m

     circular reinforced concrete

     piping of 800 mm diameter

•   Manhole construction                                               20 units
منتشرشده در Water and Sewage
برچسب‌ها

 

 

 

 

c9b002fe1bb0320831a8ae78670fdb6f XL

 

 

Project: Complete rehabilitation and revamping of IrankhodroSaze Company (Peikanshahr)

 

Employer: Irankhodrosazeh Company

Contract: PC

Start and finish date: 2008-4-20 until 2008-7-20

Discipline

• Civil
• Mechanical
• Electrical
 

Highlights

Complete rehabilitation and revamping of a 4 story building to transform an old residential building to office. Including the complete removal of partition and loading bearing walls to create a completely open office area, including of mechanical and electrical rooms of facility together with complete smoke/fire

.detection system

 

Items of works

All of the steel works                   100 ton
منتشرشده در Buildings
برچسب‌ها
%ب ظ، %19 %006 %-2638 ساعت %23:%

Double Span Bridge Construction in Tehran-Shomal Highway

 

Picture7

 

 

Project: Double Span Bridge Construction in Tehran- Shomal Highway

Employer: Tehran-Shomal highway company

Contract: PC

Start and finish date: 2007-5-27 until 2008-11-27

Discipline:

  • Civil
  • Mechanical
  • Electrical

Highlights:

The Bridge consisted of plate girder on each side, 100,000 kg girders. The bridge was constructed using strand jacks. The jacks were arranged in a "pull-push" configuration enabling accurate and thorough control throughout the installation of the main elements (girders).

Items of works:

 

Earth works

45,000 m3

Earth fill works

250,000m3

Reinforcement

450,000 kg

Concreting

4,000m3

Steel structures

1,000,000 kg

منتشرشده در Buildings
برچسب‌ها
%ق ظ، %26 %416 %779 ساعت %08:%شهریور

Comprehensive outsourcing of Ghods water and sewer operations and maintenance

srg\

Project: Comprehensive outsourcing of Ghods water and sewer operations and maintenance

Employer: Tehran west’s water and wastewater company

contract: PC

Start and finish date: 2013-5-12 until 2014-11-12

Discipline:

Civil
Mechanical
Electrical

Highlights:

Production and distribution of potable water including repair, maintenance, transport, and installation and operation of networks and domestic service lines, etc.
The contract, which was signed in such scale for the first time, was comprehensive and encompassed all the activities previously carried out and managed by the Ghods Water and Sewer Authorities.
منتشرشده در Water and Sewage
برچسب‌ها
%ب ظ، %17 %006 %806 ساعت %23:%ارديبهشت

Shiraz 3000m3potable water reservoir-double concentric concrete cylinders

3899dfe821816fbcb3db3e3b23f81585 XL

 

 

Project: Shiraz 3000m3potable water reservoir-double concentric concrete cylinders

Employer: Water and wastewater organization of Shiraz

Contract: PC

Start and finish date: 2012-6-25 until 2013-6-25

Discipline:

  • Civil
  • Mechanical
  • Electrical

Highlights:

Ancillary works including valve chamber, gantry crane structure, complete chlorination system with control panel, etc.

Items of work:

 

Heavy soil and rock cutting

11800 m3

Reinforcement

1200000kg

Concreting

1250 m3

Shuttering 

 3,400 m2

منتشرشده در Water and Sewage
برچسب‌ها
%ب ظ، %17 %004 %806 ساعت %23:%ارديبهشت

Outsourcing of Maintenance and repair of Bushehr Port complex

d61d44254608dd06ccdd2ff02982d14d L

 

 

Project:

                                               Outsourcing of Maintenance and repair of Bushehr Port complex

Employer:

                                               Bushehr ports and maritime organization

Contract:

                                               PC

Start and finish date:

                                               2010-7-20 until 2011-7-20

Discipline:

                                                • Civil

                                               • Mechanical

                                               • Electrical
Highlights:
Complete rehabilitation of electrical. /mechanical, Communicational and building systems Construction of 5 fully furnished guest houses for the Bushehr Ports and marine organization All the lighting and energy conservation units were integrated within the IBM systems. Fully furnished marine control room for operation control, surveillance and guidance.
Items of works:
                                               • Reinforcement 42,107kg

                                               • Steel works 265,110 kg

                                               • Concrete 3,250 m3

                                               • Pipe laying in various sizes 30,220 m • Shuttering 5,790 m2

منتشرشده در Electrical and Mechanical
برچسب‌ها
%ق ظ، %23 %299 %-2664 ساعت %06:%

The completion of Azadi stadium subway station Employer

6RSbdp4643gpWs-bd595d1de198485898bf2b19b7c0a6df

 

 

Project:

                                               The completion of Azadi stadium subway station Employer: Tehran and suburb's subway station

 

 

Contract:

                                               PC

 

Start and finish date:

                                               2007-7-23 until 2008-4-23

 

Discipline:

                                               • Civil

                                               • Mechanical

                                               • Electrical

 

Highlights:

                                               • Various control rooms for the operations, lightings, switching, boards, train operations, escalators, etc.

 

Items of works:
                                               • Concreting 3,200 m3

                                               • Shuttering 14,000m2

                                               • Finishing works 7,800 m2

                                               • Pavement 21,500 m2

منتشرشده در Electrical and Mechanical
برچسب‌ها
%ب ظ، %17 %004 %806 ساعت %23:%ارديبهشت

Hashtgerd Islamic Azad University main building

 787ae9ec9023a82f5aa7e4c1a64f73cb XL

 

Project:

                                                       Hashtgerd Islamic Azad University main building
Employer:

                                                       Hashtgerd Islamic Azad University

Contract:

                    PC

Start and finish date:

                                                       2009-11-7 until 2010-12-17
Discipline:

                                                        • Civil

                                                       • Mechanical

                                                       • Electrical

Highlights:
• Water cooled air conditioning for 7000 m2 of area in 4 floors Installation of complete electrical and mechanical systems for the whole building, supporting the lighting, the air conditioning, the data center, etc. The building included central computer room, Fire detection system together with the accessories for IBM( Intelligent Building Management Systems).
Items of works:
                                                       • Reinforcement 170,000 kg

                                                       • Steel Structure 560,000 kg

                                                       • Concrete 2300 m3

                                                       Stone and tile works 11,800m2

                                                       • Brick walls and Partitions 5,500m2

                                                       • Central computer room 6o m2

منتشرشده در Buildings
برچسب‌ها
%ق ظ، %29 %181 %-2638 ساعت %03:%

Bushehr Islamic Azad University

 

 af2ef6a0e2c9c528b09655df79f3b312 XL

 

Project:

                                              Bushehr Islamic Azad University, Department of Humanitie and Behavioral Science Employer                     

Contract:

                                               PC                        
Start and finish date:

                                               2010/3/2 until 2011/7/2
Discipline:

                                               • Civil

                                               • Mechanical

                                               • Electrical

Highlights

                                               • Central air conditioning consisting of chillers, evaporators and condensers etc. for a 4 floors building of 4000 m2 constructed                                                   area.

Main Items Of Work:

                                               • Reinforcement 105,000 kg

                                               • Steel structure 300,000 kg

                                               • Concrete works 1580 m3

                                               • Facade and other 5,800 Stone works

                                               • Brick wails and Partitions 6

                                               • False ceiling 9=2

منتشرشده در Buildings
برچسب‌ها
   تهران .یوسف آباد . خیابان جهان آرا . خیابان 16/1 . پلاک 164
    021-88028049-88022286-88012610
  info@abshekansaz-co.com
    (داخلی 108 ) 88022286

 

دسترسی سریع

   
No result...

تمامی حقوق نزد شرکت آریان الوند محفوظ است