Project: Comprehensive outsourcing of Ghods water and sewer operations and maintenance

Employer: Tehran west’s water and wastewater company

contract: PC

Start and finish date: 2013-5-12 until 2014-11-12

Discipline:

Civil
Mechanical
Electrical

Highlights:

Production and distribution of potable water including repair, maintenance, transport, and installation and operation of networks and domestic service lines, etc.
The contract, which was signed in such scale for the first time, was comprehensive and encompassed all the activities previously carried out and managed by the Ghods Water and Sewer Authorities.
%ب ظ، %17 %006 %806 ساعت %23:%ارديبهشت

Shiraz 3000m3potable water reservoir-double concentric concrete cylinders

3899dfe821816fbcb3db3e3b23f81585 XL

 

 

Project: Shiraz 3000m3potable water reservoir-double concentric concrete cylinders

Employer: Water and wastewater organization of Shiraz

Contract: PC

Start and finish date: 2012-6-25 until 2013-6-25

Discipline:

  • Civil
  • Mechanical
  • Electrical

Highlights:

Ancillary works including valve chamber, gantry crane structure, complete chlorination system with control panel, etc.

Items of work:

 

Heavy soil and rock cutting

11800 m3

Reinforcement

1200000kg

Concreting

1250 m3

Shuttering 

 3,400 m2

%ب ظ، %17 %004 %806 ساعت %23:%ارديبهشت

Outsourcing of Maintenance and repair of Bushehr Port complex

d61d44254608dd06ccdd2ff02982d14d L

 

 

Project:

                                               Outsourcing of Maintenance and repair of Bushehr Port complex

Employer:

                                               Bushehr ports and maritime organization

Contract:

                                               PC

Start and finish date:

                                               2010-7-20 until 2011-7-20

Discipline:

                                                • Civil

                                               • Mechanical

                                               • Electrical
Highlights:
Complete rehabilitation of electrical. /mechanical, Communicational and building systems Construction of 5 fully furnished guest houses for the Bushehr Ports and marine organization All the lighting and energy conservation units were integrated within the IBM systems. Fully furnished marine control room for operation control, surveillance and guidance.
Items of works:
                                               • Reinforcement 42,107kg

                                               • Steel works 265,110 kg

                                               • Concrete 3,250 m3

                                               • Pipe laying in various sizes 30,220 m • Shuttering 5,790 m2

%ق ظ، %23 %299 %-2664 ساعت %06:%

The completion of Azadi stadium subway station Employer

6RSbdp4643gpWs-bd595d1de198485898bf2b19b7c0a6df

 

 

Project:

                                               The completion of Azadi stadium subway station Employer: Tehran and suburb's subway station

 

 

Contract:

                                               PC

 

Start and finish date:

                                               2007-7-23 until 2008-4-23

 

Discipline:

                                               • Civil

                                               • Mechanical

                                               • Electrical

 

Highlights:

                                               • Various control rooms for the operations, lightings, switching, boards, train operations, escalators, etc.

 

Items of works:
                                               • Concreting 3,200 m3

                                               • Shuttering 14,000m2

                                               • Finishing works 7,800 m2

                                               • Pavement 21,500 m2

%ب ظ، %17 %004 %806 ساعت %23:%ارديبهشت

Hashtgerd Islamic Azad University main building

 787ae9ec9023a82f5aa7e4c1a64f73cb XL

 

Project:

                                                       Hashtgerd Islamic Azad University main building
Employer:

                                                       Hashtgerd Islamic Azad University

Contract:

                    PC

Start and finish date:

                                                       2009-11-7 until 2010-12-17
Discipline:

                                                        • Civil

                                                       • Mechanical

                                                       • Electrical

Highlights:
• Water cooled air conditioning for 7000 m2 of area in 4 floors Installation of complete electrical and mechanical systems for the whole building, supporting the lighting, the air conditioning, the data center, etc. The building included central computer room, Fire detection system together with the accessories for IBM( Intelligent Building Management Systems).
Items of works:
                                                       • Reinforcement 170,000 kg

                                                       • Steel Structure 560,000 kg

                                                       • Concrete 2300 m3

                                                       Stone and tile works 11,800m2

                                                       • Brick walls and Partitions 5,500m2

                                                       • Central computer room 6o m2

صفحه2 از7
   تهران .یوسف آباد . خیابان جهان آرا . خیابان 16/1 . پلاک 164
    021-88028049-88022286-88012610
  info@abshekansaz-co.com
    (داخلی 108 ) 88022286

 

دسترسی سریع

   
No result...

تمامی حقوق نزد شرکت آریان الوند محفوظ است